OFFICE WORK

 

Electrical Plan Review
(Based on 42 Circuit 240 Volt Single Phase Service)
$1,500 base price
  Make suggestions.
  Make corrections.

 

Engineering
(Based on 42 Circuit 240 Volt Single Phase Service)
$3,500 base price
  Load calculations.
  Circuit location and distribution.
  Equipment specifications.
 FIELD WORK

 

Soil Testing and Report
(Price does not include travel)
$ 1,500 base rate
  Soil resistance testing.
  Test report and ground rod recommendations.

 

Ground Rod Installation Supervision
(Price does not include travel)
$ 1,500 base rate
  Supervise drilling team.
  Assemble and install ground rod.
  Oversee bentonite back fill mixing and installation.

 

System Performance Verification
(Price does not include travel)
$ 1,500 per day
  Fluke Model 43 power analysis testing.
  Ground rod resistance verification.
  Issue final test results and report.

 

Day Rate For Out Of Area Travel $1,500 per day
  Rate is based on a 10 hour work day.
  Travel Day Rate $750  per day
  Time is based on door-to-door travel.

 

Travel Accommodations  
  All arrangements shall be made by Ground One, unless otherwise specified. Class of travel will be no less than Business Class or better. Hotel accommodations shall be Marriott Residences or equivalent.
 